Essex-Kent Superlinks: Difference between revisions
From Transport Knowledge Wiki
new |
remove whitespace |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Header}} | |||
{{publication record | {{publication record | ||
| title = Essex-Kent Superlinks | | title = Essex-Kent Superlinks | ||
| Line 6: | Line 7: | ||
| publisher = {{Publisher|Transport Action Network}} | | publisher = {{Publisher|Transport Action Network}} | ||
| keywords = {{KW|Car dependency}} {{KW|Economy}} {{KW|Public transport}} {{KW|Heavy rail}} {{KW|Traffic}} | | keywords = {{KW|Car dependency}} {{KW|Economy}} {{KW|Public transport}} {{KW|Heavy rail}} {{KW|Traffic}} | ||
| locations = {{location|Essex}} {{location|Kent}} | | locations = {{location|Essex}} {{location|Kent}} {{location|London}} | ||
| live_url = {{live link | live_url=https://transportactionnetwork.org.uk/wp-content/uploads/TAN-Essex-Kent-Superlinks-web.pdf | test_date=26 February 2025 }} | | live_url = {{live link | live_url=https://transportactionnetwork.org.uk/wp-content/uploads/TAN-Essex-Kent-Superlinks-web.pdf | test_date=26 February 2025 }} | ||
| archive_url = {{archive link |archived_url=https://web.archive.org/web/20250226113433/https://transportactionnetwork.org.uk/wp-content/uploads/TAN-Essex-Kent-Superlinks-web.pdf | archived_date=26 February 2025 }} | | archive_url = {{archive link |archived_url=https://web.archive.org/web/20250226113433/https://transportactionnetwork.org.uk/wp-content/uploads/TAN-Essex-Kent-Superlinks-web.pdf | archived_date=26 February 2025 }} | ||
}} | }} | ||
{{Footer}} | |||
Latest revision as of 09:46, 28 February 2025
| Title | Essex-Kent Superlinks |
| Subtitle | Smarter, cheaper alternatives to the Lower Thames Crossing to turbocharge Essex and Kent |
| Publisher | |
| Date | |
| Summary, keywords and locations | |
| Summary | "other options for crossing the Thames near Dartford had never been properly explored and were dismissed on the flimsiest of reasons in 2009. The Roberts Report proposes alternative solutions to spending £10bn on the Lower Thames Crossing (LTC), that will bring longer lasting results than the 5 years relief predicted at the Dartford Crossing, at a fraction of the cost." |
| Keywords | |
| Locations | |
| How to find this document | |
| Publication | |
| Archive | |
The home of sustainable transport knowledge |
| Found this useful? Please donate to help with running costs |
