RIA Electrification Cost Challenge: Difference between revisions
From Transport Knowledge Wiki
→top: refine category, replaced: archive link → archive link WBM |
No edit summary |
||
| Line 5: | Line 5: | ||
| date = {{PD|March 2019}} | | date = {{PD|March 2019}} | ||
| publisher = {{publisher|Railway Industry Association}} | | publisher = {{publisher|Railway Industry Association}} | ||
| keywords = {{KW|Decarbonisation}} {{KW|Heavy rail}} {{KW|Railway | | keywords = {{KW|Decarbonisation}} {{KW|Heavy rail}} {{KW|Railway electrification}} | ||
| locations = {{location|Great Britain}} | | locations = {{location|Great Britain}} | ||
| live_url = {{live link | live_url=https://www.nsar.co.uk/wp-content/uploads/2019/03/RIAECC.pdf | test_date= 26 February 2025 }} | | live_url = {{live link | live_url=https://www.nsar.co.uk/wp-content/uploads/2019/03/RIAECC.pdf | test_date= 26 February 2025 }} | ||
Latest revision as of 20:23, 7 July 2026
| Title | RIA Electrification Cost Challenge |
| Publisher | |
| Date | |
| Summary, keywords and locations | |
| Summary | "perception of high cost and delays on some early projects, notably GWEP, were in danger of destroying confidence in future electrification which can deliver significant benefits for passengers, freight users and the environment. In 2018, RIA therefore established the Electrification Cost Challenge to ensure that objective and independent evidence was available, and that electrification remained one of the options to be considered when upgrading the UK railway system and its trains as demonstrated by a range of more successful projects" |
| Keywords | |
| Locations | |
| How to find this document | |
| Publication | |
| Archive | |
The home of sustainable transport knowledge |
| Found this useful? Please donate to help with running costs |
